Hone
Products
installers
contarcts
technical
contact
costeffective
aesthetically
enviromentally

Ecofin is a cost-effective, and environmentally friendly single ply roofing membrane which is ideal for both new-build and refurbishment projects.

Ecofin is manufactured from thermoplastic poleofin (TPO) and the patented products contain no plasticizers or oils thus allowing Ecofin to be locally recycled.

Ecofin is a no-flame product being either bonded in adhesive or mechanically fixed and unlike many single ply membranes Ecofin is ideally suited for overlaying bituminous roofing systems.

Ecofin has a proven track record, is approved by the NHBC and has BBA certificate number 04/4182

 
 
NEW Installations
    Project – Surestart Thurnscoe, Rotherham. 270m2
Roofing Contractor – Everlast Waterproofing Ltd
Main Contractor – QSP Construction Group
System Used – Delta 2000 GF3 vapour control layer bonded to the plywood deck, Deltatherm 100mm TR27 fully bonded to the vapour control, Ecofin FG TNT 1.5mm fully bonded to the insulation in Ecofix A7561 adhesive. Details in GS1.5mm heat bonded to Ecofin metal.

    Project – New Housing development, Belper Derbyshire. 640m2
Roofing Contractor – Midland Butyl Ltd
Main Contractor – Radleigh Homes
System Used – Ecovap vapour control layer, Deltatherm TR27 90mm mechanically fixed to new plywood deck, Ecofin FG TNT 1.5mm in Dark Grey fully bonded to the insulation in Ecofix adhesive.

Project – New Housing development, Lancefield Quay, Glasgow
Roofing Contractor – Weatherproofing Advisors Limited
Main Contractor – Miller Construction
System Used –
FG TNT 1.5 in Dark Grey with standing seam effect

                                   

      Project – Mixed Retail/Housing development, High Street, Ilford. 520m2
Roofing Contractor – Saunders Roofing Ltd
Main Contractor – Rok Construction
System Used – Delta Vapour MLVB vapour control layer torch-applied to concrete deck, Deltatherm Cut-to-falls insulation fully bonded to the vapour control, Ecofin FG TNT 1.8mm fully bonded to the insulation in Ecofix adhesive. Details in GS1.5mm heat bonded to Ecofin metal which was specially manufactured to suit the curved profile of the building.
 

  Project – Jo Richardson Community School and Eastbury School - 14,000 m2 in total.
Roofing Contractor – Ashgate Roofing Systems Limited
Main Contractor
– Bouygues UK
System Used –
Delta 2000 sanded as vapour control layer, Kingspan TR27 insulation board bonded in Ecofix high foam adhesive, with Ecofin FG TNT 1.8 in light grey fully bonded to the insulation board.

Refurbishment
               
Chineham
Shopping
Centre
Domestic
Project

Fradley
Park

Shepperton
Nissan
St Neotst
Car Showroom s
   
Domestic
Project
   
Thameside
Collage
 
 
     
DELTA SP Tel: 01246 82 66 00